Griffin Logo

Menu Item Home

Menu Item Caijiaying Project
Menu Item Chairman's Statement
Menu Item Company Constitution
Menu Item Contacts & Advisers
Menu Item Corporate Governance
Menu Item Corporate Introduction
Menu Item Financials
Menu Item Investor Relations
Menu Item Legal
Menu Item Management
Menu Item News Index
Menu Item Photo Gallery
Menu Item Presentations
Menu Item Share Information
Menu Item Spitfire Oil
Menu Item Videos


Griffin Mining News
Date:08 March 2006
Headline:Gold results from underground drilling

Griffin Mining Limited (“Griffin”or the “Company”) is extremely pleased to announce the results of the underground drilling programme completed at the Caijiaying zinc-gold mine to the end of December 2005.

Summary of best results:

  • 8.80 metres @ 19.20 g/t gold & 7.35% zinc
  • 9.65 metres @ 10.08 g/t gold & 10.11% zinc
  • 22.7 metres @ 8.36 g/t gold & 6.44% zinc
  • 10.20 metres @ 8.65 g/t gold & 5.04% zinc
  • 11.55 metres @ 7.38 g/t gold & 8.34% zinc
  • 6.20 metres @ 14.27 g/t gold & 13.96% zinc
  • 9.50 metres @ 7.81 g/t gold & 6.97% zinc
  • 5.00 metres @ 11.15 g/t gold & 4.67% zinc
  • 5.45 metres @ 8.92 g/t gold & 10.17% zinc

The results show that there is an emerging gold resource within a larger zone of zinc mineralization, as was foreshadowed in the pre-mining studies. The majority of the high gold values sit below the level of current mining activity (the 1355 level) and will not be mined until later in the mining schedule. Ongoing investigations are continuing to try to define the controls on the gold distribution including research at the University of Tasmania in Australia.

The attached table lists the best intersections recorded to date within the whole of the Zone III drilling programme which fall within the Jin Long Lode, the first area for drilling up a mineable gold resource within Zone III.

Mladen Ninkov, Griffin’s Chairman, commented as follows:

"These extraordinary results speak for themselves”


Significant intersections from underground drilling in Jin Long Lode
(of >3m@3grams per tonne gold)

Hole

From

To

Interval

Au g/t

Zn%

Pb%

Ag g/t

UGCJY-005

76.00

81.00

5.00

3.86

7.26

0.01

11

UGCJY-008

77.60

81.17

3.57

7.16

13.43

0.02

15

UGCJY-015

27.30

38.26

10.96

4.92

3.76

0.14

15

UGCJY-040

21.00

25.20

4.20

6.54

5.47

0.04

25

UGCJY-079

30.00

34.30

4.30

3.24

5.46

0.02

18

UGCJY-090

40.00

46.00

6.00

5.32

5.82

0.19

46

UGCJY-105

68.90

71.90

3.00

4.00

6.15

0.01

6

UGCJY-120

29.00

34.05

5.05

6.74

7.73

0.05

28

UGCJY-123

38.00

48.20

10.20

8.65

5.04

0.02

21

UGCJY-134

36.00

39.50

3.50

4.45

7.56

0.66

143

UGCJY-154

17.00

20.45

3.45

3.72

5.45

0.01

6

UGCJY-167

45.25

54.90

9.65

10.08

10.11

0.21

71

UGCJY-168

60.55

66.00

5.45

8.92

10.17

0.14

47

UGCJY-170

57.25

61.50

4.25

5.29

4.72

0.09

44

UGCJY-190

72.75

76.70

3.95

3.59

5.88

0.02

17

UGCJY-192

47.00

59.00

12.00

3.58

2.75

0.01

12

UGCJY-200

42.70

49.50

6.80

6.55

2.60

0.22

44

UGCJY-202

35.50

45.00

9.50

7.81

6.97

0.04

22

UGCJY-213

40.00

45.00

5.00

11.15

4.67

0.13

27

UGCJY-214

109.00

117.80

8.80

19.20

7.35

0.05

37

UGCJY-214

134.90

141.10

6.20

14.27

13.96

0.04

13

UGCJY-219

58.10

63.20

5.10

6.29

7.98

0.65

42

UGCJY-223

82.30

105.00

22.70

8.36

6.44

0.20

62

UGCJY-223

76.15

80.05

3.90

5.28

2.13

0.15

40

UGCJY-223

70.50

74.00

3.50

4.56

2.25

0.02

11

UGCJY-228

102.00

109.00

7.00

3.11

6.39

0.02

15

UGCJY-231

34.00

37.00

3.00

3.25

2.18

0.04

7

UGCJY-262

57.85

65.00

7.15

4.44

10.39

0.01

5

UGCJY-268

22.80

26.00

3.20

3.51

8.06

2.89

75

UGCJY-272

22.00

33.55

11.55

7.38

8.34

0.16

37

UGCJY-272

36.00

50.10

14.10

3.02

3.49

0.03

25

UGCJY-274

38.00

45.20

7.20

4.71

2.49

0.01

12

UGCJY-275

34.90

43.10

8.20

3.93

6.19

0.04

16

UGCJY-276

42.80

47.00

4.20

8.79

4.61

0.02

17

UGCJY-294

41.00

45.55

4.55

4.70

13.12

0.02

13

UGCJY-295

31.50

36.40

4.90

4.24

1.81

0.03

10

UGCJY-313

52.95

57.00

4.05

3.20

3.04

0.01

25

UGCJY-379

66.70

71.00

4.30

6.65

5.88

0.46

126

Griffin Mining Limited
6th Floor
60 St James's Street
London
SW1A 1LE

Tel: +44 (0)20 7629 7772
Fax: +44 (0)20 7629 7773

Copyright Griffin Mining Ltd. © 1998-2009 All Rights Reserved
Maintained by Magellan Systems