|
Griffin Mining News
At the annual general meeting held today of the shareholders of Griffin Mining Limited (“Griffin” or the “Company”), all resolutions were passed. At the meeting the Chairman, Mr. Mladen Ninkov, gave a report on the progress of the development of Caijiaying. The Chairman reported that both dry and wet commissioning had now been successfully completed and that production was to commence next Wednesday, 15th June. Furthermore, the Company has successfully contracted to drill 18,000 metres of exploration drilling with a reverse circulation (“RC”) drill rig to test the extension to the zone III ore body and to test the epithermal gold anomalies at Caijiaying. The RC drill rig is currently on route to China. To the Company’s knowledge, this is the first time an RC drill rig is to be used in China for an exploration programme.
|
|||||||
|
Griffin Mining Limited 6th Floor 60 St James's Street London SW1A 1LE |
||||||||
|
Tel: +44 (0)20 7629 7772 Fax: +44 (0)20 7629 7773 |
Copyright Griffin Mining Ltd. © 1998-2009 All Rights Reserved Maintained by Magellan Systems |